Different feasibility studies have been prepared for our customers. The feasibility studies handle different subjects and market sectors. Production of renewable natural gas from biogas instead of producing electricity is one of the important subjects for German operators of anaerobic digestion plants under the requirements of the revised renewable energy law. Another subject is the utilization of biochemical additives in anaerobic digestion plants to minimize the losses of biodegradable organic material during the processing of kitchen waste. The feasibility studies provide the necessary technical and economical impacts and advices for investment decisions to the customers
Conversion from electricity to biomethane production The majority of biogas plants use biogas produced from…
The bioCNG plants have production capacities for 15 – 25 tons per day of bioCNG…
Recently, GPS Renewables took over 90 % of the business shares in proweps envirotec GmbH.
We have prepared the complete engineering for the biological waste treatment (anaerobic digestion and composting)…
Our longtime customer BRS Bioenergie GmbH has recently inaugurated his new biomethane production plant in…
The modernization works which included the design, engineering, supply and commissioning of a pretreatment and…