We have prepared the complete engineering for the biological waste treatment (anaerobic digestion and composting) at Amari, Crete. This plant will treat the organic fraction of municipal solid waste and biowaste from source separated collection. Two dry digesters handle the different waste fractions separate to produce biogas for electricity and heat generation. The digestate from the anaerobic digestion process is stabilized in a forced aerated closed tunnel composting plant. Air from the composting plant as from the buildings is treated in a biofilter. Currently, we support our customer in the commissioning of the plant.
Conversion from electricity to biomethane production The majority of biogas plants use biogas produced from…
The bioCNG plants have production capacities for 15 – 25 tons per day of bioCNG…
Recently, GPS Renewables took over 90 % of the business shares in proweps envirotec GmbH.
Our longtime customer BRS Bioenergie GmbH has recently inaugurated his new biomethane production plant in…
The modernization works which included the design, engineering, supply and commissioning of a pretreatment and…
Innovative project to modernize and extend the existing anaerobic digestion plant of VafabMiljö in Västeras, Sweden.